Project

Trafford House

Trafford House, 8 Station Way, Basildon, Essex SS16 5XX
Client
Job cost
£300k
Scaffold size
9,450
square meters
JOB DURATION
52 weeks
After successfully tendering for Trafford House – a large office complex, a stone’s throw away from Basildon’s busy commuter railway station – Texo Scaffolding were contracted to supply scaffolding to ensure the safe removal and refurbishment of the building that was to be transformed into residential flats.

Due to the size of the project, we elected to erect and remove the scaffolding in five phases. This saved the client unnecessary hire costs and ensured work was constant and cost effective.

The complex design required to undertake the work was further complicated by the need for strategically placed debris shoots for external and internal waste materials to be moved off site in a timely and safe manner. These were purpose built and met all the Health and Safety requirements ensuring the safety of workers using the sight.

We are pleased to announce that the entire project ran smoothly and without problems.

"It was a pleasure working with the client, the RGB Group. The scaffolding design was complex and there were challenges that we managed to take in our stride. Good communications between us and the client were key and we are delighted to report that everything went to plan."
Gary Silke
Texo Scaffolding Operations Director